wdt_ID wdt_created_by wdt_created_at wdt_last_edited_by wdt_last_edited_at Task & Details Low-End High-End Required or MNBR
1 kelly 16/02/2024 01:11 PM kelly 21/02/2024 04:50 PM

Permits and time to create the plan.

3,000.00 3,000.00 Required
2 kelly 16/02/2024 01:11 PM kelly 21/02/2024 04:51 PM

Drawings by a draftsman to submit to the city.

3,600.00 6,600.00 Required
3 kelly 16/02/2024 01:11 PM kelly 21/02/2024 04:51 PM

Potential Geotech requirements depending on the ground/slope.

3,000.00 3,000.00

Geotech MNBR

4 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:29 AM

Phase 1. Exterior only. Electrical panel upgrade.

The pricing depends on where the transformer is located in relation to the house, have the power lines been run underground yet? Will you be the first underground wires on your block, if so, you may have to pay for the transformer itself. The city quotes this.

6,000.00 24,000.00 Required
5 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:30 AM

Water ¾” pipe to 1” upgrade from the street to the home. Most homes in Penticton have to upgrade from the city to the home. The pricing depends on where the water lines run - under a driveway? Where is the city shut off in relation to the house? Does it makes sense to relocate your watermain inside the house?

7,800.00 14,400.00

Water Pipe MNBR

6 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:31 AM

Demolitions of existing structure. Pricing depends on testing of materials and how it needs to be legally disposed.

2,400.00 6,000.00

Demolition MNBR

7 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:31 AM

Excavation work to dig the new site. Pricing depends on access, whether you have a fence, the size of it, additional obstacles, roots, rocks, etc.

6,000.00 18,000.00 Required
8 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:32 AM

Radon barrier.

3,600.00 3,600.00 Required
9 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:33 AM

Concrete forming and concrete.

12,000.00 12,000.00 Required
10 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:33 AM

Perimeter drainage.

4,200.00 4,200.00 Required
11 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:34 AM

Gravel and bedding sand has to be hauled in – machinery and transport costs. Pricing depends on how much is needed.

3,600.00 7,200.00 Required
12 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:34 AM

Phase 1. Plumbing & gas requirements for the new structure. Exterior. Rough-in only.

6,000.00 6,000.00 Required
13 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:35 AM

Framing and trusses. This is the second inspection by the city.

18,000.00 30,000.00 Required
14 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:35 AM

Phase 2. Plumbing and HVAC ran throughout the structure. This is the second plumbing inspection. Running all of the pipes and ducting inside. Pricing depends on if you're adding AC, ductless split units. If baseboards heat, it will be less but electrical costs will be more.

12,000.00 30,000.00 Required
15 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:36 AM

Phase 2. Electrical work ran throughout the structure. Pricing depends on baseboard heat or furnace? How many light fixtures?

12,000.00 18,000.00 Required
16 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:37 AM

Insulation installed. Pricing depends on type. (Blow in? Spray? Batt?) and how much.

9,600.00 18,000.00 Required
17 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:37 AM

Window and doors. Pricing depends on how fancy you get and how many.

14,400.00 24,000.00 Required
18 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:38 AM

Double garage doors. Pricing depends on your style choices.

7,200.00 14,400.00 Required
19 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:39 AM

Drywall boarding and taping. Pricing depends on how many rooms and details. Are we finishing inside the garage as well?

12,000.00 24,000.00 Required
20 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:39 AM

Priming and painting. Pricing depends on how much and number of colours, how much trim and doors to paint.

6,000.00 12,000.00 Required
21 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:39 AM

Flooring. Pricing depends on material. Leaving garage as concrete.

6,000.00 12,000.00 Required
22 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:40 AM

Bathroom. Pricing depends on style choices and finishing.

18,000.00 30,000.00 Required
23 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:40 AM

Kitchen cabinets, sink, countertops. Pricing depends on style choices and finishing.

24,000.00 36,000.00 Required
24 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:41 AM

Lighting. Pricing depends on style and amount.

1,200.00 5,400.00 Required
25 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:41 AM

Baseboards and trim and window casings. Pricing dependds on size and details.

6,000.00 9,000.00 Required
26 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:42 AM

Roof. Pricing depends on materials and pitch.

12,000.00 18,000.00 Required
27 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:42 AM

Siding - Vinyl or Hardie. Pricing depends on which you choose. Vinyl is cheaper, Hardie is nicer but more money.

24,000.00 48,000.00 Required
28 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:42 AM

Soffits and gutters. Pricing depends on height and colour.

9,600.00 14,400.00 Required
29 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:43 AM

Exterior window and door trim. Pricing depends on how many.

6,000.00 9,600.00 Required
30 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:43 AM

Walkways, stairs, railings. A walkway is required for carriage homes from the front street for emergency services. Pricing depends on length and materials required.

12,000.00 36,000.00 Required
31 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:44 AM

Landscaping. Pricing depends on sizing, materials and details.

6,000.00 24,000.00

Landscaping MNBR

32 kelly 16/02/2024 01:11 PM kelly 23/02/2024 11:44 AM

Driveway. Unless there are parking regulations from the city this may not be required.

6,000.00 24,000.00

Driveway MNBR

33 kelly 16/02/2024 01:11 PM kelly 19/02/2024 10:32 AM

General Labour.

50,000.00 50,000.00 Required
Total: $ 333,200.00 Total: $ 594,800.00